Skip to main content

Date input

This element is a basic calendar. The graphic origin of the Date input corresponds with the geometric center of the Date input. The particularity of this element is that you can change date input element when simulation is running. Value modification is done by writing on it or just clicking on calendar. Date can also be initialized with element parameter tab before simulation.

This element must be used with HMI context.

Icon​

dateInput

HMI Representation​

dateInput

External parameters​

You can edit the units

Show/Hide all parameters
parametereditable via "Parameter" tabupdatable via a controllerdescriptiondefault unittype
X-axis position✔️✔️Position of the element on the X-axis.pxInteger number
Y-axis position✔️✔️Position of the element on the Y-axis.pxInteger number
Visibility✔️✔️This parameter allows you to choose if you want the element to be visible or not on the scene during the execution of the scenario. If the item is part of a group, it can inherit the value of that group.-Enumeration (visible, hidden, inherit)
Width❌❌Length of the element on the X-axis.pxInteger number
Height❌❌Width of the element on the Y-axis.pxInteger number
Year field❌❌Value of year.-Integer number
Month field❌❌Value of month.-Integer number
Day field❌❌Value of day.-Integer number
Angle✔️✔️Angle of rotation of the element compared to its initial position.degreeDecimal number

Triggered behaviours​

See Actions page for more explanation.

Show/Hide all triggered behaviours

Destroy​

At the reception of the flow, the element is destroy.

No parameters for this triggered behaviour.

Events​

See Events page for more explanation.

Show/Hide all events
eventdescription
On Parameter Value ChangedThe element can send information to the model when the value of the selected parameter has changed
At initializationThe date input can send information to the model once at initialization
ContinuallyThe date input can send information to the model continuously
On changeThe date input can send selected date to the model when date is changing (year, month, day)